Update iteration details in EAP

  • Release version: Xanadu
  • Updated July 31, 2025
  • 1 minute to read
  • Edit details of a PI or a Sprint to update details such as name, team capacity, committed points.

    Before you begin

    Create next PI and Sprint from EAP Backlog.

    Role required: sn_apw_advanced.eap_user

    Procedure

    1. Navigate to Workspaces > Strategic Planning Workspace > Enterprise Agile Planning.
    2. From the Agile structure section of the left navigation panel, choose your EAP team.
    3. From the Backlog tab of an ART or an Agile Team, select the name of the iteration to open its details in the side panel.
    4. From the side panel, edit details such as Name, Capacity, Committed points and others.

      Sprint details in the side panel in EAP.

    5. Save changes by selecting Save.