Enable cost rollup calculations

  • Release version: Xanadu
  • Updated August 1, 2024
  • 1 minute to read
  • Enable rollup calculations from the project properties.

    Before you begin

    Role required: it_project_manager

    Procedure

    1. Navigate to All > Project > Settings > Preferences.
    2. Select Enable project cost rollup.
    3. Click Save.

    Result

    Rollup values are read-only on forms. Point to the icon beside the field for a tooltip message.
    Figure 1. Tooltip
    Tooltip message