Create an operational schedule for hardware assets
Define the scheduled operational time, which is the duration during which the asset will be in use, by creating an operational schedule.
Before you begin
Important:
The settings to enable the tracking of asset performance are available with Hardware Asset Management version 13.0.0 and later.
Role required: asset
About this task
An operational schedule record is stored in the Asset schedule [sn_itam_common_asset_schedule] table. If an operational schedule isn't defined, the Default operation schedule (24/7) hours is applied.
Note:
The calculation of asset key performance indicators (KPIs) begins when the asset first moves to the In Use state. Therefore, the linked operational schedule must cover the entire period for accurate results.