You can configure the planned task fields to roll up the field values in the parent
entity.
About this task
By default the following fields are configured to roll up for
any planned task and planned task derivatives:
Cost, Budget, Effort, Actual date, Planned date, Duration, Percent Complete
Procedure
-
Navigate to .
-
Open the Planned task rollup table.
-
In the Related links, click Show List.
-
Click New.
-
Fill out the Planned task rollup form (see table).
-
Click Submit.
Table 1. Planned task rollup form fields
| Field |
Description |
| Child |
Select the table you want to include or
exclude. |
| Field |
Select the column name you want to include or
exclude. |
| Navigator |
The reference column of the parent to which the value
must be rolled up. |
| Parent |
Select the parent table. |
| Application |
Auto-generated value. |
| Rollup |
Select the check box to allow roll up. Leave the
field unchecked to exclude the field from
rollup. |