Migrating indicator scores

  • Rversion finale: Australia
  • Mis à jour 12 mars 2026
  • 2 minutes de lecture
  • The Performance Analytics Scores [pa_scores] table was split into two tables. This structure helps with processing large numbers of scores. You can migrate your scores from the old table structure to the new, using the score migration tool.

    Avertissement :
    The new table structure is not supported on Oracle databases.

    In Istanbul, the Scores [pa_scores] table was split into Scores Level 1 [pa_scores_l1] and Scores Level 2 [pa_scores_l2]. The pa_scores_l2 table contains the second-level breakdown matrix of scores and the pa_scores_l1 table contains all other scores. This separation of scores ensures optimal performance when collecting and analyzing scores, and enables larger sets of scores. New instances created on the Istanbul release or later use the new scores tables by default.

    Instances created prior to Istanbul still use the original Scores [pa_scores] table after upgrading.

    Important :
    For full details on migrating Performance Analytics scores to the new table structure, see KB1294371.

    Migration Monitor

    After beginning the migration, you can track the migration status by navigating to Performance Analytics > Scores Migration Monitor.

    If any errors occur during migration, contact Customer Service and Support to resolve the issue.

    Delays in starting score migration

    If any of the following processes are running, score migration remains in the Waiting state until they stop:
    • Data collector jobs
    • Collection cleaner jobs
    • Scoresheet editing

    Schedule the Performance Analytics scores migration

    Schedule the automated migration process to move existing scores to the new table structure.

    Avant de commencer

    Role required: admin. Users with the pa_admin role can view the migration monitor page but cannot schedule the migration.

    Pourquoi et quand exécuter cette tâche

    Migrating scores improves performance and scalability of Performance Analytics. Migration should be performed during off-peak hours.

    During migration you cannot collect, modify, or delete scores. Scheduled data collection jobs do not run during migration. After migration completes, check any data collection jobs that were scheduled to run during the migration, as these jobs were suspended.

    Remarque :
    • The scores migration can take several hours to complete, depending on the number of scores. Schedule the migration in a non-production instance and then carefully plan the migration in production.
    • The original Scores [pa_scores] table is truncated 10 days after successful migration.

    Procédure

    1. Navigate to All > Performance Analytics > Scores Migration Monitor.
    2. Click the Schedule Scores Migration button.
      The scores migration is scheduled. The page displays the time that the migration is scheduled to start, and the estimated completion time.
    3. Facultatif : Click the Logs or Active Jobs links to view additional information about the migration.
      If there are any data collection or cleanup jobs running when you start the migration, the migration waits for those jobs to complete before beginning. All scheduled collection and cleanup jobs are paused during the migration.

    Que faire ensuite

    If the migration fails for any reason, contact Customer Service and Support for assistance. Existing scores remain in place.