Create Task Mining project

  • Rversion finale: Australia
  • Mis à jour 12 mars 2026
  • 1 minute de lecture
  • Generate a Task Mining project analysis from the Process Mining Workspace by selecting a process flow node.

    Avant de commencer

    Role required: sn_tm_core.analyst, sn_tm_core.admin, or sn_tm_core.power_user

    Creating a Task Mining project enables you to get task-level insights across workstation apps, including third parties. You can create a Task Mining project either from the Analyst workbench or the Opportunity details page of Process Mining. The integration preserves traceability between process-level insights and task-level findings, avoiding fragmented analysis and reducing navigation between tools.

    Important :
    To create a Task Mining project from Process Mining, you must have the Task Mining (sn_tm_core) plugin installed and configured. For more information, see Configuring Task Mining.

    Procédure

    1. Navigate to Workspaces > Process Mining Workspace.
    2. Select the project you want to create a Task Mining analysis for.
      Remarque :
      Ensure that your project table is not be in the promin.task_mining.blocked.tables property.
    3. Select a node on the graph from the Analyst workbench.
      A window is displayed with details related to the node.

      Alternately, you can select the Task Mining tab on the Opportunity details page. Select an improvement opportunity, and then select Create project on the page.

      Create Task Mining project from Opportunity details tab

    4. Select Create project in the Task Mining section.

      Create Task Mining project from Analyst Workbench

      The project summary page is displayed with project details and task scope auto-populated. A list of workstation users whose activity data you must collect is generated. For more information on Task Mining projects, adding users, and collecting workstation activity, see Defining the scope of Task Mining projects.

      Project summary

    5. Select the users whose data you want to collect.
    6. Select Create project.
      A notification is displayed when the project is created and ready to use.
    7. Select the Associated projects icon from the right pane.
      A list of Task Mining projects associated with the Process Mining project is displayed.
    8. Select View project for the project you created.

      The project opens in the Task Mining Workspace. For information on Task Mining analyses, see Task Mining analyses. After project creation once the analysis becomes available, we can view the task mining user activity dashboard for the selected list of users by clicking View project.

      You can also create a draft project, and continue project creation later from the Associated projects section.

    Que faire ensuite

    Run a mining job to generate a project analysis. Using categorization, refine the presentation of the project data and share your analysis. For more information, see Generating a project data analysis.