As a finance specialist, if a finance case is assigned to you, accept the case to start resolving it.
Vorbereitungen
Role required: sn_fin_ops.specialist
Prozedur
-
Navigate to either of the following:
-
In the Finance Operations workspace, select the List icon (
) to open the List page.
-
From the list page, navigate to either of the following submodules:
-
Select a case number link from the Number column.
-
Select Accept.
Hinweis: The Accept option is available only if the cases assigned to you are in the draft state.
Abbildung : 1. Accept draft finance cases assigned to you
The state of the accepted case changes to Work in Progress.
-
Select Save.