Work plan example
You can create a work plan to define a maintenance schedule for multiple assets based on their installation date.
The following image illustrates the maintenance plan for two assets installed on different dates.
For example, A hospital has two MRI machines installed on different dates and hence follows a different life cycle. Create a flexible work plan for 15 years to provide the maintenance service to these assets at the following
intervals based on their installation date:
- Perform the first two warranty maintenance at the interval of 365 days from the date of installation.
- After the first two warranty maintenance are over, perform maintenance every two years for the next eight years.
- After ten years, perform maintenance every year.
Define a maintenance schedule for multiple assets
To schedule a warranty maintenance for assets based on their installation date, define a general plan by applying filtering conditions to the assets table, [alm_assets] to identify the matching record of assets require maintenance.
Before you begin
Role required: admin
Procedure
| To | Do this |
|---|---|
| Create first schedule |
|
| Create second schedule |
|
| Create third schedule |
|