Using Operational Technology Change Management to optimize your production process
Summarize
Summary of Using Operational Technology Change Management to Optimize Your Production Process
The Operational Technology Change Management application allows teams to collaboratively manage changes to operational technology (OT) devices and industrial equipment configurations. This includes optimizations, alterations in production processes, and vulnerability fixes. By separating OT change requests from IT change requests, you can effectively manage changes based on network type and site-specific needs.
Show less
Key Features
- Separation of Change Requests: Manage OT change requests independently from IT requests, which facilitates targeted attention to OT devices.
- Automatic Network Type Assignment: OT change requests created from the Industrial Workspace are automatically assigned a Network Type of OT to distinguish them from IT requests.
- Change Models: Utilize Basic and Advanced OT Change Models to guide the change request process, allowing for thorough analysis and approval workflows.
Key Outcomes
Implementing Operational Technology Change Management enables:
- Efficient handling of disruptions in OT services through structured change requests.
- Clear visibility into the state transitions of change requests, from initiation to closure, ensuring all necessary evaluations are completed.
- Enhanced collaboration among team members, including remediation owners and technicians, leading to improved production process reliability.
The Operational Technology Change Management application enables your team members to work collaboratively on changes to operational technology (OT) devices or industrial equipment configurations. These changes include any optimizations, alterations in the production process, or vulnerability fixes.
Operational Technology Change Management overview
By using the Operational Technology Change Management application, you can manage your OT change requests separately from your Information Technology (IT) change requests. You can separate OT change requests from IT change requests by the network type and you can manage OT change requests per site.
- An OT remediation owner, who's responsible for fixing vulnerabilities on OT devices, wants to initiate a change to fix a group of vulnerabilities.
- An OT technician, who's responsible for OT configurations and plant engineering activities, wants to execute a change to fix a malfunctioned robotic arm on the industrial floor.
- A plant head, who's responsible for overall production activity, wants to review and approve a change requested by the engineering team.
OT change requests
OT change requests occur when there’s a disruption in service from an OT device on an OT network. In some cases, the OT device may not be known when the change request is created. When you create an OT change request from the Industrial Workspace, the change request is automatically assigned a Network Type of OT. This attribute is used to distinguish an OT change request from an IT change request. This field isn’t displayed by default. For more information about OT devices, see OT device related items and related lists.
For more information about how to create an OT change request, see Create a change request.
Separating an IT and OT change
When the Operational Technology Change Management application is installed on your instance, you can choose a Network Type of IT, OT, or None. New change requests are assigned a Network Type of None by default.
Operational Technology Change Management model state transitions
| State | Description |
|---|---|
| New | An OT change request is initiated. |
| Plan | The OT change request is analyzed with the following criteria:
|
| Implementation | The change is performed on the targeted OT device. |
| Closed | The change record is closed after the change is completed. |
| Canceled | The change record is canceled and the change isn’t applied to the OT device. |
| State | Description |
|---|---|
| New | An OT change request is initiated. |
| Plan | The OT change request is analyzed with the following criteria:
|
| Approve | The reviewers approve or deny the OT change request. |
| Implementation | The change is performed on the targeted OT device. |
| Post-Implementation Review | Add additional OT change tasks if needed and perform the following checks:
|
| Closed | The change record is closed after the change is completed. |
| Canceled | The change record is canceled and the change isn’t applied to the OT device. |