Adding notes to a project
Add, view, and remove notes for a project to help manage tasks, ideas, and insights. Tag others to notify them to view a note.
- To add or delete notes, you must have the sn_process_optimization_analyst, sn_process_optimization_power_user, or sn_process_optimization_admin role.
- The sn_process_optimization_viewer can add notes to a project that has been shared with them.
View a note
Review notes posted for a project.
Before you begin
Role required: sn_process_optimization_analyst, sn_process_optimization_power_user, sn_process_optimization_admin, or sn_process_optimization_viewer
Notes can be viewed from a main or linked process. A note can be edited or deleted from the process map in which it was created.
Procedure
- Select the project to view a note from.
-
From the project view, select the Notes icon (
) to open the Notes panel.
-
From the Show list, select whether to show one or more of
these options:
- Current Model Notes - Shows notes created on the process you're currently viewing.
- Main Model Notes - From a linked process, shows notes created on the main process.
- All Linked Notes - Shows all notes created on the main and all linked processes.
Add a note
Add a note to a project to review later.
Before you begin
Role required: sn_process_optimization_analyst, sn_process_optimization_power_user, sn_process_optimization_admin, or sn_process_optimization_viewer
Procedure
Edit a note
Update a project note.
Before you begin
Role required: sn_process_optimization_analyst, sn_process_optimization_power_user, or sn_process_optimization_admin
About this task
A note can be edited from the main or linked process in which it was created.
Procedure
Delete a note
Delete a project note once you resolve or want to remove it.
Before you begin
Role required: sn_process_optimization_analyst, sn_process_optimization_power_user, or sn_process_optimization_admin
About this task
A note can be deleted from the main or linked process in which it was created. Deleting a note doesn't destroy it, but only removes it from the project view. A note's record remains accessible from the Notes tab of the Related lists section.
Procedure
View a snapshot
Review snapshots of process maps posted for a project.
Before you begin
Role required: sn_process_optimization_analyst, sn_process_optimization_power_user, sn_process_optimization_admin, or sn_process_optimization_viewer