CMDB Health process status: incomplete score
The CMDB dashboard displays the string 'incomplete score' for a metric when it fails to calculate the score for the metric.
'Incomplete score' is displayed when:
- The number of CIs that are failing the tests of one of its sub-metric, reaches the failure
threshold set for the metric. In this situation, the processing status for the respective
parent metric (for example, correctness) is set to 'incomplete' in the CMDB Health Metric
Status [cmdb_health_metric_status] table. Processing for the failing metric in the current
cycle stops, and therefore there are no aggregated health scores for the sub-metric, the
parent parent metric, or the overall CMDB Health.
To remediate, you need to resolve the underlying cause of CIs failing the sub-metric tests. See CMDB Health process status: failure threshold reached for more information about resolving the failures of the sub-metric.
- An error is encountered while processing the sub-metric.
To remediate, examine the system logs to determine the cause of the error. After fixing the cause of the problem, restart processing by manually executing the respective parent metric dashboard job.