Run a planned work schedule on demand
Planned work schedules mainly run using the Planned Maintenance Nightly Run scheduled job. However, you can make the schedule to run immediately or change the date when a schedule should run, if needed.
Before you begin
Role required: admin
About this task
Procedure
- Navigate to .
- Open a work plan that contains the schedule to run.
- In the Planned Work Schedules related list, select the maintenance schedule you want to run.
- In the Related Link section, select Run on demand.