Linking parent-child contracts
- UpdatedJul 31, 2025
- 2 minutes to read
- Zurich
- Employee Service Management
Link a parent contract to a child contract to establish hierarchical relationships between contract requests and inherit fields from the parent contract request.
You can associate a contract request with a parent contract from the Related Contract Request tab. When linked, the Parent contract field in the contract request Details tab is automatically populated with the parent contract request number. Depending on configuration, child contracts can inherit fields from the parent contract. Additionally, the associated contract repository records for the parent and child contract requests are automatically linked.
- The user must be assigned to the contract request, be a group manager, or a collaborator.
- The contract request must be in one of the following states: Draft, Work in progress, Awaiting review, or Contract signed.Note: If the contract request is in Contract signed state, the parent contract request must be in Contract signed or Closed complete state.
- The parent contract must not be in a Canceled state.
- Only one parent contract can be selected while linking.
- The parent contract must be a single contract type using own paper or third-party paper.
Related Content
- Link parent contract requests
Link parent contracts during drafting and negotiation phases to establish hierarchical relationship between the parent and child contracts.
- Link and inherit parent contract fields
Link parent contracts during drafting and negotiation phases to establish hierarchical relationship between the parent and child contracts, and automatically inherit the configured fields from the parent contract.
- Remove a linked contract
Remove a linked parent contract from contract requests when you have linked a wrong contract request or the linking is no longer required.
- Configure field mapping for parent-child contract linking
Select the child contract type and configure the parent-child field mapping to inherit the mapped fields from the parent contract when linking.