| Name |
Name of the planned work schedule. |
| Short description |
Brief summary of the planned work schedule. |
| Trigger |
Timing condition that triggers the execution of the plan. For more information on triggers and examples, see Learn about triggers for work schedules
|
| Plan |
Name of the work plan that this schedule is a part
of. This field is automatically set to the name of the
work plan. |
| Active |
Option to enable the schedule for a work plan. |
| Duration
Details |
| Trigger type |
Duration category for the work schedule. For example, if
you select Multiple days of the week,
the Due days of week field appears so
you can specify on which days in a week planned work should
be performed. Different fields appear depending on the
trigger type selected. This field appears when
Duration is selected for
Trigger. |
| Monthly type |
Select either Fixed or Floating to mention a particular day of the
month to run the schedule. This field appears when the
Trigger type field is set to
Monthly. |
| Annually type |
Select either Fixed or Floating to specify a particular
day and month in a year to run the schedule. This field
appears only when the Trigger
type field is set to
Annually. |
| Repeat every |
Specify how often the schedule should repeats. For
example, if you select weekly repetitions, specify the
frequency such as every week or every two weeks. |
| Repeat |
Frequency of the planned work schedule to repeat. This
field appears when the Trigger
type field is set to
Interval. |
| Due day of week |
Day of week to repeat on. This field appears when
Weekly is selected for
Trigger type. |
| Due day of month |
Day of the month to repeat on. This field appears when
Monthly or
Annually is selected for
Trigger type. |
| Due month |
Month to repeat on. This field appears when
Annuallyis selected for
Trigger type. |
| Due time |
Time of day in hours, minutes, and seconds. This field
appears for all trigger types except
Interval. |
| Lead time |
Number of days prior to the Requested Due
by date to determine the date on which work should
begin. That date is pre-filled in the Scheduled
start field for the task. This field appears when
Duration is selected for
Trigger. |
| Preserve calculated interval |
Option to restart the interval calculation from the time that the
work order was completed. This field appears when
Interval, Monthly,
or Annually is selected for
Trigger type and
Fixed is selected for the
Monthly type and Annually
type field. |
| Condition |
Condition that determines if the maintenance schedule
should run. This field appears when
Condition is selected for
Trigger. |
| Script |
Script that determines if the maintenance schedule should
run. For example, Maintenance runs if the script returns
true. The "current" variable is available and represents the
record that is undergoing maintenance, for example, a
CI. This field appears when
Script is selected for
Trigger. |
| Meter
Details |
| Table |
Lists the table associated with the assets or CIs selected for
maintenance. This field appears when Meter or Condition is selected
for Trigger. |
| Field |
Field used to define what the occurrences in the
Every field apply to. For example, if the
pages field is entered, the Every field can
contain the number of pages that are printed before the action defined
in the plan is performed. This field appears when
Meter is selected for
Trigger. |
| Every |
Number of occurrences, such as miles or pages that must be
recorded before the work plan is executed. The value must be greater
than zero (0). This field appears when Meter
is selected for Trigger. |
| Preserve calculated meter |
Option to restart the meter calculation based on the value defined
in the Every field. |
| Effectivity Details |
| Start planned schedule based on |
Option based on which the planned work schedule should
determine its start date. |
| Effective Start |
Effective start date from when the planned work is scheduled to work. |
| Effective start reference |
Field value that should be used to determine the start date of the
planned work. Effective start reference displays the list of fields
from the table that is selected to create conditions for the work
plan. For example, Printer [cmdb_ci_printer] This field appears only
when Field Value is selected from
Start planned schedule based
on. |
| Schedule |
Name of the schedule that should be used to calculate the
start date of the work plan. This field appears only when
Schedule is selected from
Start planned schedule based
on. |
| End planned schedule based on |
Value that determines the end date of a planned work
schedule. |
| Frequency |
Determine how often the planned work is scheduled to be
performed. For example, if frequency is mentioned as 4, the
planned work cycle will run for four times and ends after
the fourth iteration. |