Global activities are Orchestration activities created in the global scope.
Any activities you create in the global scope are listed in the Global category in the
Packs and Custom tabs of the Workflow Editor.
그림 1. Global activities
Test Server Alive activity
The Test Server Alive activity determines if a target system is alive by its response
to a particular protocol.
This activity replaces an activity by the same name available in releases prior to Istanbul. If you have a workflow created in a previous version that uses the deprecated activity, your workflow will
continue to work normally after upgrading to Istanbul. However, all new workflows must use the custom version of this activity. This activity was built with the Probe activity template, which gives workflow administrators the ability to store input and output variables in the databus.
Input variables
표 1. Test Server Alive input variables
Variable
Description
port_probes
A comma separated list of protocols to use to check for signs of activity on
the target machine (example:
wmi,wins,https,ssh,http,https,snmp,dns)
hostname
Hostname or IP address of the target system to check.
Output variables
표 2. Test Server Alive output variables
Variable
Description
alive
Code that indicates whether or not the server is alive. If any value but
'1' is returned, the server is not alive.
Conditions
표 3. Test Server Alive conditions
Condition
Description
Success
Activity determined that the device is running.
Failure
Activity failed to determine if the target device is running. Failure could
be caused by a missing protocol or a device that is not accessible.