Edit a project

  • Release version: Zurich
  • Updated July 31, 2025
  • 1 minute to read
  • Edit a project from the Project Definition form to generate an updated process map.

    Before you begin

    Role required: sn_process_optimization_power_user, or sn_process_optimization_admin
    • The sn_process_optimization_analyst role can edit a project if they created it.

    Procedure

    1. Navigate to All > Process Mining > Process Mining Workspace.
    2. From the Project list, select the ellipses beside the project you want to edit.
    3. Select Edit.
    4. Enter changes in the desired fields and select Update.
      The table can't be changed after defining an activity, breakdown, or child table.

    What to do next

    Perform a data extraction on the updated project to view it in Analyst workbench, and apply relevant filters.