Use the Scope tab to add an asset to the scope of the plan. If
the business impact analysis (BIA) application is installed, you can view the primary
elements defined in the plan template, its recovery time objective (RTO) and recovery point
objective (RPO) details, and the business impact analysis.
Before you begin
Role required: sn_bcm.admin, sn_bcm.program_manager, or sn_bcm.planner
Procedure
-
Navigate to .
-
Click the lists icon (
).
-
Click In Draft state in the Planning list.
-
Click the link to the plan record in the Name
column.
-
Click the Scope tab.
If the plan is created from a plan template, you can view the primary elements
defined in the plan template.
-
To add new scope to the plan, click Add.
-
On the Add Items modal, select the plan asset.
-
Click Add.
Assets that are displayed in the Add Items modal belong to the element
definition type identified in the
Primary element
recovered field of the plan template.
If an asset has an
approved BIA attached to it while adding the plan asset, then the approved
BIA is automatically added in the BIA column of the
asset.
If the BIA is attached to the plan scope, then you cannot edit
the RTO and RPO as they are values populated from the BIA.
Note:
- If the BIA application is installed, then RTO and RPO fields are visible and non-editable. BIA field is visible and editable. You can attach a BIA
by clicking the link BIA icon (
).
- If BIA is not installed, then RTO and
RPO fields are visible and editable.
- If an approved BIA is attached to the plan, then
RTO, RPO, and
BIA fields are populated with values and
they are read only and non-editable.
-
To update a plan asset or to link a BIA to it, click the asset in the
Name column.
-
Click the link BIA icon (
).
If there is an approved BIA for the asset, then the BIA is automatically attached to the asset when you click the link. If you have adjusted the RTO and RPO values based on the criticality of
an asset, then the Adjusted RTO and Adjusted RPO values take precedence over the system-calculated RTO and RPO values. The adjusted RTO and RPO values are displayed in the
Recovery Time Objective
and
Recovery Point Objective fields when you click

.
-
Click Save.
-
To remove an asset from the plan list, select the item and click
Remove.